Marine projects

Rehabilitation of Ashkelon breakwaters

The Project

General description

Reconstruction of three detached breakwaters located northen to Marina Ashkelon that was built in 1997. During the lifetime most of breakwater are almost disapeared. The purpose of the project is to repair the breakwater and to bring them back according to the update design for further protect Ashkelon beach and cliffs from erosion.

 

General description

The work includes but is not limited on a) reorganizing of existing fallen rocks; b) supplying of various grades of rocks for new construction (1-6 tons); and c) placing it according to design cross-sections.

[video src="https://www.adyr.co.il/wp-content/uploads/WhatsApp-Video-2019-09-16-at-18.06.55.mp4" /]